Level 2ChargePoint

Woodland Building

60 Woodland Rd, Maplewood, NJ 07040, USA

6.5 kW charging across 1 charging stalls, operated by ChargePoint. A per-kWh price is not listed.

6.5 kW1 charging stalls
ChargePoint

Charging location

Maplewood, New Jersey

J1772

The record

The station at a glance

Woodland Building is listed as level 2 charging in Maplewood, New Jersey, operated by ChargePoint. It records 1 charging stalls and J1772 connectors.

The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.

Peak power
6.5 kW
Stalls
1
Connectors
1
Listed price
Not listed

Connectors

Plug options

1 listed

Power is the station’s peak, not a per-connector rating.

Access and setting

What surrounds the charger

Access: PublicAll hours except 2am-6am. EV only period ends at 6pm. Can legally be ICE'd after 6.Free parkingWorkplace

These details come from the station listing, not a live check.

Nearby

Other charging stops

Browse the directory
Level 2

The West

13.5 kW8 stalls

West Orange, New Jersey· 2.7 mi

J1772
Price not listedBlink
EV charger at Irvington ParkLevel 2

Irvington Park

6.5 kW1 stall

Irvington, New Jersey· 2.7 mi

J1772
$0.20 /kWhChargePoint
Charging

charge point

Power not listed1 stall

West Orange, New Jersey· 2.8 mi

J1772
$0.35 /kWhIndependent

Fernandez Construction Corp is <1 mi away.

Keep looking

This stop in context

Compatible vehicles

Cars that can charge here

Exact connector matches for J1772. An adapter may bridge another standard, but support varies by vehicle and station.

Time at this post

How long would your car sit here?

Level 2 · AC only

9 hr 37 min10% to 80%

Audi A6 e-tron takes about 6.48 kW on AC, so a full pack is a different kind of wait.

Estimate from 75.8 kWh at 6.48 kW, including the tail a pack spends balancing at the end.

Common questions

Charging at Woodland Building

Where is Woodland Building?

Woodland Building is at 60 Woodland Rd, Maplewood, NJ 07040, USA.

How fast can I charge at Woodland Building?

Woodland Building lists a peak of 6.5 kW (Level 2) and J1772 connectors.

How much does charging cost at Woodland Building?

A per-kWh price is not listed for Woodland Building. Some networks bill per minute or per session instead.

How many charging stalls does Woodland Building have?

Woodland Building lists 1 charging stalls. Its listed hours are All hours except 2am-6am. EV only period ends at 6pm. Can legally be ICE'd after 6.. Live availability is not tracked.