Level 2Blink24-hour access

Ross Industries - 409 JKA Project

409 Joyce Kilmer Ave, New Brunswick, NJ 08901, USA

8.6 kW charging across 3 charging stalls, operated by Blink. A per-kWh price is not listed.

8.6 kW3 charging stalls
Blink

Charging location

New Brunswick, New Jersey

J1772

The record

The station at a glance

Ross Industries - 409 JKA Project is listed as level 2 charging in New Brunswick, New Jersey, operated by Blink. It records 3 charging stalls and J1772 connectors.

The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.

Peak power
8.6 kW
Stalls
3
Connectors
1
Listed price
Not listed

Connectors

Plug options

1 listed

Power is the station’s peak, not a per-connector rating.

Access and setting

What surrounds the charger

Access: Public24-hour accessFree parkingWorkplace

These details come from the station listing, not a live check.

Nearby

Other charging stops

Browse the directory
EV charger at Don Dutton AgencyCharging

Don Dutton Agency

Power not listed1 stall

North Brunswick Township, New Jersey· <1 mi

NACS
$0.25 /kWhIndependent
EV charger at Plum Street Parking DeckCharging

Plum Street Parking Deck

Power not listed8 stalls

New Brunswick, New Jersey· <1 mi

J1772
Price not listedIndependent
EV charger at NBPAC Parking DeckCharging

NBPAC Parking Deck

Power not listed4 stalls

New Brunswick, New Jersey· 1.0 mi

J1772
Price not listedIndependent
EV charger at Gateway GarageCharging

Gateway Garage

Power not listed5 stalls

New Brunswick, New Jersey· 1.1 mi

J1772
Price not listedIndependent
EV charger at ShellLevel 2

Shell

6.5 kW1 stall

New Brunswick, New Jersey· 1.1 mi

J1772
$0.62 /kWhChargePoint

Lacerda's Realtors LLC is <1 mi away.

Keep looking

This stop in context

Compatible vehicles

Cars that can charge here

Exact connector matches for J1772. An adapter may bridge another standard, but support varies by vehicle and station.

Time at this post

How long would your car sit here?

Level 2 · AC only

7 hr 13 min10% to 80%

Audi A6 e-tron takes about 8.64 kW on AC, so a full pack is a different kind of wait.

Estimate from 75.8 kWh at 8.64 kW, including the tail a pack spends balancing at the end.

Common questions

Charging at Ross Industries - 409 JKA Project

Where is Ross Industries - 409 JKA Project?

Ross Industries - 409 JKA Project is at 409 Joyce Kilmer Ave, New Brunswick, NJ 08901, USA.

How fast can I charge at Ross Industries - 409 JKA Project?

Ross Industries - 409 JKA Project lists a peak of 8.6 kW (Level 2) and J1772 connectors.

How much does charging cost at Ross Industries - 409 JKA Project?

A per-kWh price is not listed for Ross Industries - 409 JKA Project. Some networks bill per minute or per session instead.

How many charging stalls does Ross Industries - 409 JKA Project have?

Ross Industries - 409 JKA Project lists 3 charging stalls. It is listed as open around the clock. Live availability is not tracked.