DC fast

Mossy Nissan

12150 US-90, Houston, TX 77079, USA

50 kW charging across 3 charging stalls. $0.30 per kWh listed.

EV charging at Mossy Nissan
50 kW3 charging stalls
Independent

Charging location

Houston, Texas

CCS1CHAdeMOJ1772

The record

The station at a glance

Mossy Nissan is listed as dc fast charging in Houston, Texas. It records 3 charging stalls and CCS1, CHAdeMO, J1772 connectors.

The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.

Peak power
50 kW
Stalls
3
Connectors
3
Listed price
$0.30

Connectors

Plug options

3 listed

Power is the station’s peak, not a per-connector rating.

Access and setting

What surrounds the charger

Access: PublicDealership business hoursFree parkingDealership

These details come from the station listing, not a live check.

Nearby

Other charging stops

Browse the directory
Level 2

Nottingham Oaks

11.5 kW4 stalls

Houston, Texas· 1.3 mi

J1772
Price not listedGraviti Energy
EV charger at Air LiquideLevel 2

Air Liquide

6.5 kW2 stalls

Houston, Texas· 3.8 mi

J1772
Price not listedChargePoint
EV charger at John Eagle AcuraDC fast

John Eagle Acura

350 kW+1 stall

Houston, Texas· 4.0 mi

CCS1
$0.42 /kWhChargePoint

Nottingham Oaks is 1.3 mi away.

Keep looking

This stop in context

Compatible vehicles

Cars that can charge here

Exact connector matches for CCS1, CHAdeMO, J1772. An adapter may bridge another standard, but support varies by vehicle and station.

Time at this post

How long would your car sit here?

50 kW peak here

1 hr 4 min10% to 80%

The car asks for 50 kW here to begin with, then tapers to about 34 kW as the pack fills.

Batterypress play
draws up to 50 kW≈ 277 mi added
Audi A6 e-tron specs

A 20-minute stop adds 22% — about 87 miles of range. Filling right to 100% instead takes 1 hr 27 min.

Estimate from Audi A6 e-tron's 22-minute 10–80% time, capped by this post, on the usual taper: full power to about 45%, then a slow last fifth. A cold pack, a shared post or an older battery takes longer.

Common questions

Charging at Mossy Nissan

Where is Mossy Nissan?

Mossy Nissan is at 12150 US-90, Houston, TX 77079, USA.

How fast can I charge at Mossy Nissan?

Mossy Nissan lists a peak of 50 kW (DC fast) and CCS1, CHAdeMO, J1772 connectors.

How much does charging cost at Mossy Nissan?

Mossy Nissan quotes $0.30 per kWh. Networks set their own tariffs, and some add a session or connection fee.

How many charging stalls does Mossy Nissan have?

Mossy Nissan lists 3 charging stalls. Its listed hours are Dealership business hours. Live availability is not tracked.