Level 2ChargePoint24-hour access

Monterey Business Park

38345 30th St E Suite F1, Palmdale, CA 93550, USA

19.2 kW charging across 1 charging stalls, operated by ChargePoint. $0.45 per kWh listed.

EV charging at Monterey Business Park
19.2 kW1 charging stalls
ChargePoint

Charging location

Palmdale, California

J1772

The record

The station at a glance

Monterey Business Park is listed as level 2 charging in Palmdale, California, operated by ChargePoint. It records 1 charging stalls and J1772 connectors.

The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.

Peak power
19.2 kW
Stalls
1
Connectors
1
Listed price
$0.45

Connectors

Plug options

1 listed

Power is the station’s peak, not a per-connector rating.

Access and setting

What surrounds the charger

Access: Public24-hour accessFree parkingWorkplace

These details come from the station listing, not a live check.

Nearby

Other charging stops

Browse the directory
EV charger at Children's BureauLevel 2

Children's Bureau

6.5 kW4 stalls

Palmdale, California· 3.9 mi

J1772
$0.30 /kWhChargePoint
EV charger at Kohl'sLevel 2

Kohl's

9.6 kW1 stall

Palmdale, California· 4.3 mi

J1772
$1.00 /kWhJOLT

Antelope Valley Volkswagen is 3.4 mi away.

Keep looking

This stop in context

Compatible vehicles

Cars that can charge here

Exact connector matches for J1772. An adapter may bridge another standard, but support varies by vehicle and station.

Time at this post

How long would your car sit here?

Level 2 · AC only

5 hr 40 min10% to 80%

Audi A6 e-tron takes about 11 kW on AC, even at this 19 kW post, so a full pack is a different kind of wait.

Estimate from 75.8 kWh at 11 kW, including the tail a pack spends balancing at the end.

Common questions

Charging at Monterey Business Park

Where is Monterey Business Park?

Monterey Business Park is at 38345 30th St E Suite F1, Palmdale, CA 93550, USA.

How fast can I charge at Monterey Business Park?

Monterey Business Park lists a peak of 19.2 kW (Level 2) and J1772 connectors.

How much does charging cost at Monterey Business Park?

Monterey Business Park quotes $0.45 per kWh. Networks set their own tariffs, and some add a session or connection fee.

How many charging stalls does Monterey Business Park have?

Monterey Business Park lists 1 charging stalls. It is listed as open around the clock. Live availability is not tracked.