Level 2Magnolia Power Project
145 Magnolia Blvd, Burbank, CA 91502, USA
62.5 kW charging across 2 charging stalls, operated by ChargePoint. $0.37 per kWh listed.
Charging location
Burbank, California
The record
The station at a glance
Magnolia Power Project is listed as dc fast charging in Burbank, California, operated by ChargePoint. It records 2 charging stalls and CCS1, CHAdeMO connectors.
The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.
- Peak power
- 62.5 kW
- Stalls
- 2
- Connectors
- 2
- Listed price
- $0.37
Connectors
Plug options
Power is the station’s peak, not a per-connector rating.
Access and setting
What surrounds the charger
These details come from the station listing, not a live check.
Nearby
Other charging stops
N Lake St Parking Lot is <1 mi away.
Keep looking
This stop in context
Compatible vehicles
Cars that can charge here
Exact connector matches for CCS1, CHAdeMO. An adapter may bridge another standard, but support varies by vehicle and station.

Acura ZDX
From $64,500 · 327 mi EPA · 190 kW DC

Audi A6 e-tron
395 mi EPA · 225 kW DC

Audi e-tron GT
249 mi EPA · 268 kW DC

Audi Q4 e-tron
288 mi EPA · 165 kW DC
Time at this post
How long would your car sit here?
62.5 kW peak here
The car asks for 63 kW here to begin with, then tapers to about 34 kW as the pack fills.
A 20-minute stop adds 28% — about 109 miles of range. Filling right to 100% instead takes 1 hr 13 min.
Estimate from Audi A6 e-tron's 22-minute 10–80% time, capped by this post, on the usual taper: full power to about 45%, then a slow last fifth. A cold pack, a shared post or an older battery takes longer.
Common questions
Charging at Magnolia Power Project
Where is Magnolia Power Project?
Magnolia Power Project is at 145 Magnolia Blvd, Burbank, CA 91502, USA.
How fast can I charge at Magnolia Power Project?
Magnolia Power Project lists a peak of 62.5 kW (DC fast) and CCS1, CHAdeMO connectors.
How much does charging cost at Magnolia Power Project?
Magnolia Power Project quotes $0.37 per kWh. Networks set their own tariffs, and some add a session or connection fee.
How many charging stalls does Magnolia Power Project have?
Magnolia Power Project lists 2 charging stalls. It is listed as open around the clock. Live availability is not tracked.




