Charging stationFrancis Energy

Joe Cooper Ford of Edmond

538 W Memorial Rd, Oklahoma City, OK 73114, USA

Power not listed charging across 6 charging stalls, operated by Francis Energy. $0.52 per kWh listed.

EV charging at Joe Cooper Ford of Edmond
Power not listed6 charging stalls
Francis Energy

Charging location

Oklahoma City, Oklahoma

CCS1CHAdeMOJ1772

The record

The station at a glance

Joe Cooper Ford of Edmond is listed as a charging stop in Oklahoma City, Oklahoma, operated by Francis Energy. It records 6 charging stalls and CCS1, CHAdeMO, J1772 connectors.

The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.

Peak power
Power not listed
Stalls
6
Connectors
3
Listed price
$0.52

Connectors

Plug options

3 listed

Power is the station’s peak, not a per-connector rating.

Access and setting

What surrounds the charger

Access: PublicFree parkingDealership

These details come from the station listing, not a live check.

Nearby

Other charging stops

Browse the directory
DC fast

Bob Howard Acura

62.5 kW3 stalls

Oklahoma City, Oklahoma· 1.6 mi

CCS1CHAdeMO+1
$0.51 /kWhChargePoint
EV charger at Crest Foods EdmondCharging

Crest Foods Edmond

Power not listed4 stalls

Edmond, Oklahoma· 2.1 mi

CCS1CHAdeMO
$0.52 /kWhFrancis Energy
EV charger at Homeland (3)Charging

Homeland (3)

Power not listed12 stalls

Oklahoma City, Oklahoma· 7.0 mi

NACS
$0.32 /kWhIndependent

Bob Howard Acura is 1.6 mi away.

Keep looking

This stop in context

Compatible vehicles

Cars that can charge here

Exact connector matches for CCS1, CHAdeMO, J1772. An adapter may bridge another standard, but support varies by vehicle and station.

Time at this post

How long would your car sit here?

power not listed · car's own peak

22 min10% to 80%

The record for Joe Cooper Ford of Edmond does not list a peak power, so this is what Audi A6 e-tron does at its own peak. A good DC post gets close.

Batterypress play
draws up to 195 kW≈ 277 mi added
Audi A6 e-tron specs

A 20-minute stop adds 67% — about 265 miles of range. Filling right to 100% instead takes 44 min.

Estimate from Audi A6 e-tron's 22-minute 10–80% time, capped by this post, on the usual taper: full power to about 45%, then a slow last fifth. A cold pack, a shared post or an older battery takes longer.

Common questions

Charging at Joe Cooper Ford of Edmond

Where is Joe Cooper Ford of Edmond?

Joe Cooper Ford of Edmond is at 538 W Memorial Rd, Oklahoma City, OK 73114, USA.

How fast can I charge at Joe Cooper Ford of Edmond?

The record does not list a peak charging power for this station. It lists CCS1, CHAdeMO, J1772 connectors.

How much does charging cost at Joe Cooper Ford of Edmond?

Joe Cooper Ford of Edmond quotes $0.52 per kWh. Networks set their own tariffs, and some add a session or connection fee.

How many charging stalls does Joe Cooper Ford of Edmond have?

Joe Cooper Ford of Edmond lists 6 charging stalls. Live availability is not tracked.