Level 2Tiger Athletic & Community Center at Shelby Community Park
Shelby, Michigan· 3.9 mi
2167 N Water Rd, Hart, MI 49420, USA
15.4 kW charging across 2 charging stalls, operated by OpConnect. $0.15 per kWh listed.
Charging location
Hart, Michigan
The record
Great Lakes Energy Co-Op is listed as level 2 charging in Hart, Michigan, operated by OpConnect. It records 2 charging stalls and J1772 connectors.
The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.
Connectors
Power is the station’s peak, not a per-connector rating.
Access and setting
These details come from the station listing, not a live check.
Nearby
Tiger Athletic & Community Center at Shelby Community Park is 3.9 mi away.
Keep looking
Compatible vehicles
Exact connector matches for J1772. An adapter may bridge another standard, but support varies by vehicle and station.

Acura ZDX
From $64,500 · 327 mi EPA · 190 kW DC

Audi A6 e-tron
395 mi EPA · 225 kW DC

Audi e-tron GT
249 mi EPA · 268 kW DC

Audi Q4 e-tron
288 mi EPA · 165 kW DC
Time at this post
Level 2 · AC only
Audi A6 e-tron takes about 11 kW on AC, even at this 15 kW post, so a full pack is a different kind of wait.
Estimate from 75.8 kWh at 11 kW, including the tail a pack spends balancing at the end.
Common questions
Great Lakes Energy Co-Op is at 2167 N Water Rd, Hart, MI 49420, USA.
Great Lakes Energy Co-Op lists a peak of 15.4 kW (Level 2) and J1772 connectors.
Great Lakes Energy Co-Op quotes $0.15 per kWh. Networks set their own tariffs, and some add a session or connection fee.
Great Lakes Energy Co-Op lists 2 charging stalls. It is listed as open around the clock. Live availability is not tracked.