Level 2ChargePoint24-hour access

FEMA Component Manufacturing

555 Washington St, Otsego, MI 49078, USA

6.5 kW charging across 1 charging stalls, operated by ChargePoint. A per-kWh price is not listed.

EV charging at FEMA Component Manufacturing
6.5 kW1 charging stalls
ChargePoint

Charging location

Otsego, Michigan

J1772

The record

The station at a glance

FEMA Component Manufacturing is listed as level 2 charging in Otsego, Michigan, operated by ChargePoint. It records 1 charging stalls and J1772 connectors.

The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.

Peak power
6.5 kW
Stalls
1
Connectors
1
Listed price
Not listed

Connectors

Plug options

1 listed

Power is the station’s peak, not a per-connector rating.

Access and setting

What surrounds the charger

Access: Public24-hour accessFree parkingWorkplace

These details come from the station listing, not a live check.

Nearby

Other charging stops

Browse the directory
EV charger at Budget Host InnCharging

Budget Host Inn

Power not listed2 outlets

Allegan, Michigan· 10.0 mi

NEMA 14-50
Price not listedIndependent

Midway Chevrolet Plainwell is 2.7 mi away.

Keep looking

This stop in context

Compatible vehicles

Cars that can charge here

Exact connector matches for J1772. An adapter may bridge another standard, but support varies by vehicle and station.

Time at this post

How long would your car sit here?

Level 2 · AC only

9 hr 37 min10% to 80%

Audi A6 e-tron takes about 6.48 kW on AC, so a full pack is a different kind of wait.

Estimate from 75.8 kWh at 6.48 kW, including the tail a pack spends balancing at the end.

Common questions

Charging at FEMA Component Manufacturing

Where is FEMA Component Manufacturing?

FEMA Component Manufacturing is at 555 Washington St, Otsego, MI 49078, USA.

How fast can I charge at FEMA Component Manufacturing?

FEMA Component Manufacturing lists a peak of 6.5 kW (Level 2) and J1772 connectors.

How much does charging cost at FEMA Component Manufacturing?

A per-kWh price is not listed for FEMA Component Manufacturing. Some networks bill per minute or per session instead.

How many charging stalls does FEMA Component Manufacturing have?

FEMA Component Manufacturing lists 1 charging stalls. It is listed as open around the clock. Live availability is not tracked.