Level 2Tesla Destination24-hour access

Dutch Motel

25252 Redlands Blvd, Loma Linda, CA 92354, USA

11.5 kW charging across 1 charging stalls, operated by Tesla Destination. $0.49 per kWh listed.

11.5 kW1 charging stalls
Tesla Destination

Charging location

Loma Linda, California

J1772NACS

The record

The station at a glance

Dutch Motel is listed as level 2 charging in Loma Linda, California, operated by Tesla Destination. It records 1 charging stalls and J1772, NACS connectors.

The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.

Peak power
11.5 kW
Stalls
1
Connectors
2
Listed price
$0.49

Connectors

Plug options

2 listed

Power is the station’s peak, not a per-connector rating.

Access and setting

What surrounds the charger

Access: Public24-hour accessFree parkingLodging

These details come from the station listing, not a live check.

Nearby

Other charging stops

Browse the directory
EV charger at Home2 Suites by HiltonCharging

Home2 Suites by Hilton

Power not listed6 stalls

San Bernardino, California· <1 mi

J1772
$1.00 /kWhIndependent
EV charger at EDD Tax DivisionLevel 2

EDD Tax Division

6.5 kW6 stalls

San Bernardino, California· 1.1 mi

J1772
$0.35 /kWhChargePoint

Holiday Inn Express & Suites Loma Linda- San Bernardino S by IHG is <1 mi away.

Keep looking

This stop in context

Compatible vehicles

Cars that can charge here

Exact connector matches for J1772, NACS. An adapter may bridge another standard, but support varies by vehicle and station.

Time at this post

How long would your car sit here?

Level 2 · AC only

5 hr 40 min10% to 80%

Audi A6 e-tron takes about 11 kW on AC, even at this 12 kW post, so a full pack is a different kind of wait.

Estimate from 75.8 kWh at 11 kW, including the tail a pack spends balancing at the end.

Common questions

Charging at Dutch Motel

Where is Dutch Motel?

Dutch Motel is at 25252 Redlands Blvd, Loma Linda, CA 92354, USA.

How fast can I charge at Dutch Motel?

Dutch Motel lists a peak of 11.5 kW (Level 2) and J1772, NACS connectors.

How much does charging cost at Dutch Motel?

Dutch Motel quotes $0.49 per kWh. Networks set their own tariffs, and some add a session or connection fee.

How many charging stalls does Dutch Motel have?

Dutch Motel lists 1 charging stalls. It is listed as open around the clock. Live availability is not tracked.