Level 2ChargePoint24-hour access

Direct Relief

6100 Hollister Ave, Goleta, CA 93117, USA

6.5 kW charging across 2 charging stalls, operated by ChargePoint. $0.38 per kWh listed.

6.5 kW2 charging stalls
ChargePoint

Charging location

Goleta, California

J1772

The record

The station at a glance

Direct Relief is listed as level 2 charging in Goleta, California, operated by ChargePoint. It records 2 charging stalls and J1772 connectors.

The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.

Peak power
6.5 kW
Stalls
2
Connectors
1
Listed price
$0.38

Connectors

Plug options

1 listed

Power is the station’s peak, not a per-connector rating.

Access and setting

What surrounds the charger

Access: Public24-hour accessFree parkingWorkplace

These details come from the station listing, not a live check.

Nearby

Other charging stops

Browse the directory
EV charger at Willow SpringsCharging

Willow Springs

Power not listed2 stalls

Goleta, California· <1 mi

J1772
Price not listedIndependent
EV charger at Goleta City HallCharging

Goleta City Hall

Power not listed17 stalls

Goleta, California· 1.0 mi

J1772
$0.25 /kWhPowerFlex
EV charger at Tech ParkCharging

Tech Park

Power not listed3 stalls

Goleta, California· 1.1 mi

J1772
$0.25 /kWhIndependent

AMETEK Pacific Design Technologies is <1 mi away.

Keep looking

This stop in context

Compatible vehicles

Cars that can charge here

Exact connector matches for J1772. An adapter may bridge another standard, but support varies by vehicle and station.

Time at this post

How long would your car sit here?

Level 2 · AC only

9 hr 37 min10% to 80%

Audi A6 e-tron takes about 6.48 kW on AC, so a full pack is a different kind of wait.

Estimate from 75.8 kWh at 6.48 kW, including the tail a pack spends balancing at the end.

Common questions

Charging at Direct Relief

Where is Direct Relief?

Direct Relief is at 6100 Hollister Ave, Goleta, CA 93117, USA.

How fast can I charge at Direct Relief?

Direct Relief lists a peak of 6.5 kW (Level 2) and J1772 connectors.

How much does charging cost at Direct Relief?

Direct Relief quotes $0.38 per kWh. Networks set their own tariffs, and some add a session or connection fee.

How many charging stalls does Direct Relief have?

Direct Relief lists 2 charging stalls. It is listed as open around the clock. Live availability is not tracked.