DC fastGreenspot24-hour access

Borough of Tenafly

Riveredge Rd at Tenafly Boro Hall Driveway, Tenafly, NJ 07670, USA

150 kW charging across 5 charging stalls, operated by Greenspot. $0.55 per kWh listed.

EV charging at Borough of Tenafly
150 kW5 charging stalls
Greenspot

Charging location

Tenafly, New Jersey

CCS1J1772NACS

The record

The station at a glance

Borough of Tenafly is listed as dc fast charging in Tenafly, New Jersey, operated by Greenspot. It records 5 charging stalls and CCS1, J1772, NACS connectors.

The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.

Peak power
150 kW
Stalls
5
Connectors
3
Listed price
$0.55

Connectors

Plug options

3 listed

Power is the station’s peak, not a per-connector rating.

Access and setting

What surrounds the charger

Access: Public24-hour accessFree parkingGovernment

These details come from the station listing, not a live check.

Nearby

Other charging stops

Browse the directory
EV charger at Jersey Boys/FUTURE EVCharging

Jersey Boys/FUTURE EV

Power not listed4 stalls

Englewood Cliffs, New Jersey· 3.7 mi

J1772
$1.50 /kWhFutureEV
EV charger at Warburton GarageLevel 2

Warburton Garage

7 kW11 stalls

Yonkers, New York· 3.7 mi

J1772
Price not listedFLO
EV charger at 50 Warburton AveCharging

50 Warburton Ave

Power not listed1 stall

Yonkers, New York· 3.7 mi

J1772NACS
$0.52 /kWhItsElectric

First Presbyterian Church of Englewood is 2.6 mi away.

Keep looking

This stop in context

Compatible vehicles

Cars that can charge here

Exact connector matches for CCS1, J1772, NACS. An adapter may bridge another standard, but support varies by vehicle and station.

Time at this post

How long would your car sit here?

150 kW peak here

25 min10% to 80%

The car asks for 150 kW here to begin with, then tapers to about 34 kW as the pack fills.

Batterypress play
draws up to 150 kW≈ 277 mi added
Audi A6 e-tron specs

A 20-minute stop adds 62% — about 245 miles of range. Filling right to 100% instead takes 47 min.

Estimate from Audi A6 e-tron's 22-minute 10–80% time, capped by this post, on the usual taper: full power to about 45%, then a slow last fifth. A cold pack, a shared post or an older battery takes longer.

Common questions

Charging at Borough of Tenafly

Where is Borough of Tenafly?

Borough of Tenafly is at Riveredge Rd at Tenafly Boro Hall Driveway, Tenafly, NJ 07670, USA.

How fast can I charge at Borough of Tenafly?

Borough of Tenafly lists a peak of 150 kW (DC fast) and CCS1, J1772, NACS connectors.

How much does charging cost at Borough of Tenafly?

Borough of Tenafly quotes $0.55 per kWh. Networks set their own tariffs, and some add a session or connection fee.

How many charging stalls does Borough of Tenafly have?

Borough of Tenafly lists 5 charging stalls. It is listed as open around the clock. Live availability is not tracked.