Level 2

1919 Smith Street Building

1919 Smith St Ste 15055, Houston, TX 77002, USA

7.2 kW charging across 1 charging stalls. $0.30 per kWh listed.

7.2 kW1 charging stalls
Independent

Charging location

Houston, Texas

J1772

The record

The station at a glance

1919 Smith Street Building is listed as level 2 charging in Houston, Texas. It records 1 charging stalls and J1772 connectors.

The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.

Peak power
7.2 kW
Stalls
1
Connectors
1
Listed price
$0.30

Connectors

Plug options

1 listed

Power is the station’s peak, not a per-connector rating.

Access and setting

What surrounds the charger

Access: PublicWorkplace

These details come from the station listing, not a live check.

Nearby

Other charging stops

Browse the directory
EV charger at Heritage Clay ParkingCharging

Heritage Clay Parking

Power not listed2 stalls

Houston, Texas· <1 mi

J1772
Price not listedIndependent
EV charger at Bayou PlaceCharging

Bayou Place

Power not listed2 stalls

Houston, Texas· <1 mi

J1772
$0.45 /kWhIndependent
EV charger at FIVE Houston CenterCharging

FIVE Houston Center

Power not listed18 stalls

Houston, Texas· <1 mi

J1772NACS
$0.30 /kWhTesla Destination

Heritage Clay Parking is <1 mi away.

Keep looking

This stop in context

Compatible vehicles

Cars that can charge here

Exact connector matches for J1772. An adapter may bridge another standard, but support varies by vehicle and station.

Time at this post

How long would your car sit here?

Level 2 · AC only

8 hr 39 min10% to 80%

Audi A6 e-tron takes about 7.2 kW on AC, so a full pack is a different kind of wait.

Estimate from 75.8 kWh at 7.2 kW, including the tail a pack spends balancing at the end.

Common questions

Charging at 1919 Smith Street Building

Where is 1919 Smith Street Building?

1919 Smith Street Building is at 1919 Smith St Ste 15055, Houston, TX 77002, USA.

How fast can I charge at 1919 Smith Street Building?

1919 Smith Street Building lists a peak of 7.2 kW (Level 2) and J1772 connectors.

How much does charging cost at 1919 Smith Street Building?

1919 Smith Street Building quotes $0.30 per kWh. Networks set their own tariffs, and some add a session or connection fee.

How many charging stalls does 1919 Smith Street Building have?

1919 Smith Street Building lists 1 charging stalls. Live availability is not tracked.