Level 2Blink24-hour access

Waterline Austin

511 E Cesar Chavez St, Austin, TX 78701, USA

12 kW charging across 46 charging stalls, operated by Blink. A per-kWh price is not listed.

EV charging at Waterline Austin
12 kW46 charging stalls
Blink

Charging location

Austin, Texas

J1772

The record

The station at a glance

Waterline Austin is listed as level 2 charging in Austin, Texas, operated by Blink. It records 46 charging stalls and J1772 connectors.

The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.

Peak power
12 kW
Stalls
46
Connectors
1
Listed price
Not listed

Connectors

Plug options

1 listed

Power is the station’s peak, not a per-connector rating.

Access and setting

What surrounds the charger

Access: Public24-hour accessFree parkingResidential

These details come from the station listing, not a live check.

Nearby

Other charging stops

Browse the directory
EV charger at 117 1/2 Brazos StLevel 2

117 1/2 Brazos St

6.5 kW3 stalls

Austin, Texas· <1 mi

J1772
Price not listedChargePoint
EV charger at Austin CenterLevel 2

Austin Center

6.5 kW2 stalls

Austin, Texas· <1 mi

J1772
Price not listedChargePoint
Level 2

Lavaca Plaza

6.6 kW2 stalls

Austin, Texas· <1 mi

J1772
Price not listedChargePoint
Level 2

AMLI Garage (1)

6.5 kW1 stall

Austin, Texas· <1 mi

J1772
Price not listedChargePoint

Homewood Suites by Hilton Austin Downtown is <1 mi away.

Keep looking

This stop in context

Compatible vehicles

Cars that can charge here

Exact connector matches for J1772. An adapter may bridge another standard, but support varies by vehicle and station.

Time at this post

How long would your car sit here?

Level 2 · AC only

5 hr 40 min10% to 80%

Audi A6 e-tron takes about 11 kW on AC, even at this 12 kW post, so a full pack is a different kind of wait.

Estimate from 75.8 kWh at 11 kW, including the tail a pack spends balancing at the end.

Common questions

Charging at Waterline Austin

Where is Waterline Austin?

Waterline Austin is at 511 E Cesar Chavez St, Austin, TX 78701, USA.

How fast can I charge at Waterline Austin?

Waterline Austin lists a peak of 12 kW (Level 2) and J1772 connectors.

How much does charging cost at Waterline Austin?

A per-kWh price is not listed for Waterline Austin. Some networks bill per minute or per session instead.

How many charging stalls does Waterline Austin have?

Waterline Austin lists 46 charging stalls. It is listed as open around the clock. Live availability is not tracked.