DC fastPowerFlex24-hour access

Santa Barbara County Building (3)

105 E Anapamu St, Santa Barbara, CA 93101, USA

100 kW charging across 1 charging stalls, operated by PowerFlex. $0.43 per kWh listed.

EV charging at Santa Barbara County Building (3)
100 kW1 charging stalls
PowerFlex

Charging location

Santa Barbara, California

CCS1

The record

The station at a glance

Santa Barbara County Building (3) is listed as dc fast charging in Santa Barbara, California, operated by PowerFlex. It records 1 charging stalls and CCS1 connectors.

The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.

Peak power
100 kW
Stalls
1
Connectors
1
Listed price
$0.43

Connectors

Plug options

1 listed

Power is the station’s peak, not a per-connector rating.

Access and setting

What surrounds the charger

Access: Public24-hour accessFree parkingGovernment

These details come from the station listing, not a live check.

Nearby

Other charging stops

Browse the directory
Level 2

Canary Hotel

8 kW4 stalls

Santa Barbara, California· <1 mi

J1772NACS+1
Price not listedTesla Destination
EV charger at Los Banos PoolLevel 2

Los Banos Pool

6.5 kW2 stalls

Santa Barbara, California· 1.4 mi

J1772
$0.38 /kWhChargePoint

Canary Hotel is <1 mi away.

Keep looking

This stop in context

Compatible vehicles

Cars that can charge here

Exact connector matches for CCS1. An adapter may bridge another standard, but support varies by vehicle and station.

Time at this post

How long would your car sit here?

100 kW peak here

33 min10% to 80%

The car asks for 100 kW here to begin with, then tapers to about 34 kW as the pack fills.

Batterypress play
draws up to 100 kW≈ 277 mi added
Audi A6 e-tron specs

A 20-minute stop adds 44% — about 174 miles of range. Filling right to 100% instead takes 55 min.

Estimate from Audi A6 e-tron's 22-minute 10–80% time, capped by this post, on the usual taper: full power to about 45%, then a slow last fifth. A cold pack, a shared post or an older battery takes longer.

Common questions

Charging at Santa Barbara County Building (3)

Where is Santa Barbara County Building (3)?

Santa Barbara County Building (3) is at 105 E Anapamu St, Santa Barbara, CA 93101, USA.

How fast can I charge at Santa Barbara County Building (3)?

Santa Barbara County Building (3) lists a peak of 100 kW (DC fast) and CCS1 connectors.

How much does charging cost at Santa Barbara County Building (3)?

Santa Barbara County Building (3) quotes $0.43 per kWh. Networks set their own tariffs, and some add a session or connection fee.

How many charging stalls does Santa Barbara County Building (3) have?

Santa Barbara County Building (3) lists 1 charging stalls. It is listed as open around the clock. Live availability is not tracked.