Level 2Lanterman Auditorium
La Cañada Flintridge, California· <1 mi
1300 Foothill Blvd, La Cañada Flintridge, CA 91011, USA
6.5 kW charging across 1 charging stalls, operated by ChargePoint. A per-kWh price is not listed.
Charging location
La Cañada Flintridge, California
The record
Memorial Park Park & Ride Lot is listed as level 2 charging in La Cañada Flintridge, California, operated by ChargePoint. It records 1 charging stalls and J1772 connectors.
The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.
Connectors
Power is the station’s peak, not a per-connector rating.
Access and setting
These details come from the station listing, not a live check.
Nearby
Lanterman Auditorium is <1 mi away.
Keep looking
Compatible vehicles
Exact connector matches for J1772. An adapter may bridge another standard, but support varies by vehicle and station.

Acura ZDX
From $64,500 · 327 mi EPA · 190 kW DC

Audi A6 e-tron
395 mi EPA · 225 kW DC

Audi e-tron GT
249 mi EPA · 268 kW DC

Audi Q4 e-tron
288 mi EPA · 165 kW DC
Time at this post
Level 2 · AC only
Audi A6 e-tron takes about 6.48 kW on AC, so a full pack is a different kind of wait.
Estimate from 75.8 kWh at 6.48 kW, including the tail a pack spends balancing at the end.
Common questions
Memorial Park Park & Ride Lot is at 1300 Foothill Blvd, La Cañada Flintridge, CA 91011, USA.
Memorial Park Park & Ride Lot lists a peak of 6.5 kW (Level 2) and J1772 connectors.
A per-kWh price is not listed for Memorial Park Park & Ride Lot. Some networks bill per minute or per session instead.
Memorial Park Park & Ride Lot lists 1 charging stalls. It is listed as open around the clock. Live availability is not tracked.