DC fastChargePoint24-hour access

Love's Travel Stop Three Rivers

2645 I-37, Three Rivers, TX 78071, USA

320 kW charging across 2 charging stalls, operated by ChargePoint. $0.37 per kWh listed.

EV charging at Love's Travel Stop Three Rivers
320 kW2 charging stalls
ChargePoint

Charging location

Three Rivers, Texas

CCS1NACS

The record

The station at a glance

Love's Travel Stop Three Rivers is listed as dc fast charging in Three Rivers, Texas, operated by ChargePoint. It records 2 charging stalls and CCS1, NACS connectors.

The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.

Peak power
320 kW
Stalls
2
Connectors
2
Listed price
$0.37

Connectors

Plug options

2 listed

Power is the station’s peak, not a per-connector rating.

Access and setting

What surrounds the charger

Access: Public24-hour accessFree parkingGas Station

These details come from the station listing, not a live check.

Nearby

Other charging stops

Browse the directory
EV charger at Choke Canyon State ParkCharging

Choke Canyon State Park

Power not listed3 outlets

Calliham, Texas· 9.6 mi

NEMA 14-50NEMA TT-30+1
Price not listedIndependent
EV charger at Aztec Chevrolet GMCDC fast

Aztec Chevrolet GMC

62.5 kW1 stall

Beeville, Texas· 28 mi

CCS1CHAdeMO
$0.85 /kWhChargePoint
EV charger at Eby Survey Level 2Charging

Eby Survey Level 2

Power not listed1 stall

Woodsboro, Texas· 56 mi

J1772
$0.50 /kWhIndependent

Choke Canyon State Park is 9.6 mi away.

Keep looking

This stop in context

Compatible vehicles

Cars that can charge here

Exact connector matches for CCS1, NACS. An adapter may bridge another standard, but support varies by vehicle and station.

Time at this post

How long would your car sit here?

320 kW peak here

22 min10% to 80%

The car asks for 195 kW here to begin with, then tapers to about 34 kW as the pack fills.

Batterypress play
draws up to 195 kW≈ 277 mi added
Audi A6 e-tron specs

A 20-minute stop adds 67% — about 265 miles of range. Filling right to 100% instead takes 44 min.

Estimate from Audi A6 e-tron's 22-minute 10–80% time, capped by this post, on the usual taper: full power to about 45%, then a slow last fifth. A cold pack, a shared post or an older battery takes longer.

Common questions

Charging at Love's Travel Stop Three Rivers

Where is Love's Travel Stop Three Rivers?

Love's Travel Stop Three Rivers is at 2645 I-37, Three Rivers, TX 78071, USA.

How fast can I charge at Love's Travel Stop Three Rivers?

Love's Travel Stop Three Rivers lists a peak of 320 kW (DC fast) and CCS1, NACS connectors.

How much does charging cost at Love's Travel Stop Three Rivers?

Love's Travel Stop Three Rivers quotes $0.37 per kWh. Networks set their own tariffs, and some add a session or connection fee.

How many charging stalls does Love's Travel Stop Three Rivers have?

Love's Travel Stop Three Rivers lists 2 charging stalls. It is listed as open around the clock. Live availability is not tracked.