DC fastInCharge

Ken Pollock Nissan

4 Mundy St, Wilkes-Barre Township, PA 18702, USA

50 kW charging across 1 charging stalls, operated by InCharge. $0.70 per kWh listed.

50 kW1 charging stalls
InCharge

Charging location

Wilkes-Barre Township, Pennsylvania

CCS1

The record

The station at a glance

Ken Pollock Nissan is listed as dc fast charging in Wilkes-Barre Township, Pennsylvania, operated by InCharge. It records 1 charging stalls and CCS1 connectors.

The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.

Peak power
50 kW
Stalls
1
Connectors
1
Listed price
$0.70

Connectors

Plug options

1 listed

Power is the station’s peak, not a per-connector rating.

Access and setting

What surrounds the charger

Access: PublicAccessible 24 hours / 7 days a week.Free parkingDealership

These details come from the station listing, not a live check.

Nearby

Other charging stops

Browse the directory
EV charger at Motorworld MitsubishiCharging

Motorworld Mitsubishi

Power not listed1 stall

Wilkes-Barre, Pennsylvania· <1 mi

J1772
$0.66 /kWhIndependent
Charging

Motorworld Lexus

Power not listed1 stall

Wilkes-Barre, Pennsylvania· <1 mi

J1772
$0.40 /kWhIndependent
EV charger at Motorworld HyundaiDC fast

Motorworld Hyundai

50 kW1 stall

Wilkes-Barre, Pennsylvania· 1.0 mi

CCS1CHAdeMO
$0.40 /kWhChargePoint

Motorworld Mitsubishi is <1 mi away.

Keep looking

This stop in context

Compatible vehicles

Cars that can charge here

Exact connector matches for CCS1. An adapter may bridge another standard, but support varies by vehicle and station.

Time at this post

How long would your car sit here?

50 kW peak here

1 hr 4 min10% to 80%

The car asks for 50 kW here to begin with, then tapers to about 34 kW as the pack fills.

Batterypress play
draws up to 50 kW≈ 277 mi added
Audi A6 e-tron specs

A 20-minute stop adds 22% — about 87 miles of range. Filling right to 100% instead takes 1 hr 27 min.

Estimate from Audi A6 e-tron's 22-minute 10–80% time, capped by this post, on the usual taper: full power to about 45%, then a slow last fifth. A cold pack, a shared post or an older battery takes longer.

Common questions

Charging at Ken Pollock Nissan

Where is Ken Pollock Nissan?

Ken Pollock Nissan is at 4 Mundy St, Wilkes-Barre Township, PA 18702, USA.

How fast can I charge at Ken Pollock Nissan?

Ken Pollock Nissan lists a peak of 50 kW (DC fast) and CCS1 connectors.

How much does charging cost at Ken Pollock Nissan?

Ken Pollock Nissan quotes $0.70 per kWh. Networks set their own tariffs, and some add a session or connection fee.

How many charging stalls does Ken Pollock Nissan have?

Ken Pollock Nissan lists 1 charging stalls. Its listed hours are Accessible 24 hours / 7 days a week.. Live availability is not tracked.