DC fastHotel Moraine
62005 County Rd 48, Greenport, NY 11944, USA
11.5 kW charging across 2 charging stalls, operated by AmpUp. $0.65 per kWh listed.
Charging location
Greenport, New York
The record
The station at a glance
Hotel Moraine is listed as level 2 charging in Greenport, New York, operated by AmpUp. It records 2 charging stalls and J1772 connectors.
The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.
- Peak power
- 11.5 kW
- Stalls
- 2
- Connectors
- 1
- Listed price
- $0.65
Connectors
Plug options
Power is the station’s peak, not a per-connector rating.
Access and setting
What surrounds the charger
These details come from the station listing, not a live check.
Nearby
Other charging stops
Lucas Ford is 3.3 mi away.
Keep looking
This stop in context
Compatible vehicles
Cars that can charge here
Exact connector matches for J1772. An adapter may bridge another standard, but support varies by vehicle and station.

Acura ZDX
From $64,500 · 327 mi EPA · 190 kW DC

Audi A6 e-tron
395 mi EPA · 225 kW DC

Audi e-tron GT
249 mi EPA · 268 kW DC

Audi Q4 e-tron
288 mi EPA · 165 kW DC
Time at this post
How long would your car sit here?
Level 2 · AC only
Audi A6 e-tron takes about 11 kW on AC, even at this 12 kW post, so a full pack is a different kind of wait.
Estimate from 75.8 kWh at 11 kW, including the tail a pack spends balancing at the end.
Common questions
Charging at Hotel Moraine
Where is Hotel Moraine?
Hotel Moraine is at 62005 County Rd 48, Greenport, NY 11944, USA.
How fast can I charge at Hotel Moraine?
Hotel Moraine lists a peak of 11.5 kW (Level 2) and J1772 connectors.
How much does charging cost at Hotel Moraine?
Hotel Moraine quotes $0.65 per kWh. Networks set their own tariffs, and some add a session or connection fee.
How many charging stalls does Hotel Moraine have?
Hotel Moraine lists 2 charging stalls. It is listed as open around the clock. Live availability is not tracked.





