DC fastChargePoint24-hour access

Dane County Regional Airport - Cell Phone Lot

4MJ3+3C Madison, WI, USA

62.5 kW charging across 1 charging stalls, operated by ChargePoint. $0.34 per kWh listed.

EV charging at Dane County Regional Airport - Cell Phone Lot
62.5 kW1 charging stalls
ChargePoint

Charging location

Madison, Wisconsin

CCS1CHAdeMO

The record

The station at a glance

Dane County Regional Airport - Cell Phone Lot is listed as dc fast charging in Madison, Wisconsin, operated by ChargePoint. It records 1 charging stalls and CCS1, CHAdeMO connectors.

The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.

Peak power
62.5 kW
Stalls
1
Connectors
2
Listed price
$0.34

Connectors

Plug options

2 listed

Power is the station’s peak, not a per-connector rating.

Access and setting

What surrounds the charger

Access: Public24-hour accessFree parkingAirport

These details come from the station listing, not a live check.

Nearby

Other charging stops

Browse the directory
Level 2

Wisconsin DNR

6.5 kW1 stall

Madison, Wisconsin· <1 mi

J1772
Price not listedChargePoint
EV charger at MATC Goodman FieldLevel 2

MATC Goodman Field

6.5 kW1 stall

Madison, Wisconsin· <1 mi

J1772
$0.13 /kWhChargePoint

Wisconsin DNR is <1 mi away.

Keep looking

This stop in context

Compatible vehicles

Cars that can charge here

Exact connector matches for CCS1, CHAdeMO. An adapter may bridge another standard, but support varies by vehicle and station.

Time at this post

How long would your car sit here?

62.5 kW peak here

51 min10% to 80%

The car asks for 63 kW here to begin with, then tapers to about 34 kW as the pack fills.

Batterypress play
draws up to 63 kW≈ 277 mi added
Audi A6 e-tron specs

A 20-minute stop adds 28% — about 109 miles of range. Filling right to 100% instead takes 1 hr 13 min.

Estimate from Audi A6 e-tron's 22-minute 10–80% time, capped by this post, on the usual taper: full power to about 45%, then a slow last fifth. A cold pack, a shared post or an older battery takes longer.

Common questions

Charging at Dane County Regional Airport - Cell Phone Lot

Where is Dane County Regional Airport - Cell Phone Lot?

Dane County Regional Airport - Cell Phone Lot is at 4MJ3+3C Madison, WI, USA.

How fast can I charge at Dane County Regional Airport - Cell Phone Lot?

Dane County Regional Airport - Cell Phone Lot lists a peak of 62.5 kW (DC fast) and CCS1, CHAdeMO connectors.

How much does charging cost at Dane County Regional Airport - Cell Phone Lot?

Dane County Regional Airport - Cell Phone Lot quotes $0.34 per kWh. Networks set their own tariffs, and some add a session or connection fee.

How many charging stalls does Dane County Regional Airport - Cell Phone Lot have?

Dane County Regional Airport - Cell Phone Lot lists 1 charging stalls. It is listed as open around the clock. Live availability is not tracked.