Level 2ChargePoint

City Cedar Park CP City Hall

450 Cypress Creek Road, Cedar Park, TX 78613, USA

6.5 kW charging across 1 charging stalls, operated by ChargePoint. A per-kWh price is not listed.

EV charging at City Cedar Park CP City Hall
6.5 kW1 charging stalls
ChargePoint

Charging location

Cedar Park, Texas

J1772

The record

The station at a glance

City Cedar Park CP City Hall is listed as level 2 charging in Cedar Park, Texas, operated by ChargePoint. It records 1 charging stalls and J1772 connectors.

The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.

Peak power
6.5 kW
Stalls
1
Connectors
1
Listed price
Not listed

Connectors

Plug options

1 listed

Power is the station’s peak, not a per-connector rating.

Access and setting

What surrounds the charger

Access: PublicFree parkingGovernment

These details come from the station listing, not a live check.

Nearby

Other charging stops

Browse the directory
EV charger at Cedar Park NissanDC fast

Cedar Park Nissan

50 kW2 stalls

Cedar Park, Texas· 1.1 mi

CCS1CHAdeMO+1
Price not listedInCharge
EV charger at CalizaLevel 2

Caliza

6.5 kW2 stalls

Cedar Park, Texas· 2.2 mi

J1772
Price not listedChargePoint

Cedar Park Nissan is 1.1 mi away.

Keep looking

This stop in context

Compatible vehicles

Cars that can charge here

Exact connector matches for J1772. An adapter may bridge another standard, but support varies by vehicle and station.

Time at this post

How long would your car sit here?

Level 2 · AC only

9 hr 37 min10% to 80%

Audi A6 e-tron takes about 6.48 kW on AC, so a full pack is a different kind of wait.

Estimate from 75.8 kWh at 6.48 kW, including the tail a pack spends balancing at the end.

Common questions

Charging at City Cedar Park CP City Hall

Where is City Cedar Park CP City Hall?

City Cedar Park CP City Hall is at 450 Cypress Creek Road, Cedar Park, TX 78613, USA.

How fast can I charge at City Cedar Park CP City Hall?

City Cedar Park CP City Hall lists a peak of 6.5 kW (Level 2) and J1772 connectors.

How much does charging cost at City Cedar Park CP City Hall?

A per-kWh price is not listed for City Cedar Park CP City Hall. Some networks bill per minute or per session instead.

How many charging stalls does City Cedar Park CP City Hall have?

City Cedar Park CP City Hall lists 1 charging stalls. Live availability is not tracked.