Level 2ChargePoint

Charles H. Wilson Park (1)

Parking lot, 2300-2376 Jefferson St, Torrance, CA 90501, USA

6.5 kW charging across 1 charging stalls, operated by ChargePoint. $0.25 per kWh listed.

EV charging at Charles H. Wilson Park (1)
6.5 kW1 charging stalls
ChargePoint

Charging location

Torrance, California

J1772

The record

The station at a glance

Charles H. Wilson Park (1) is listed as level 2 charging in Torrance, California, operated by ChargePoint. It records 1 charging stalls and J1772 connectors.

The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.

Peak power
6.5 kW
Stalls
1
Connectors
1
Listed price
$0.25

Connectors

Plug options

1 listed

Power is the station’s peak, not a per-connector rating.

Access and setting

What surrounds the charger

Access: PublicFree parkingPark

These details come from the station listing, not a live check.

Nearby

Other charging stops

Browse the directory
EV charger at Ganahl LumberLevel 2

Ganahl Lumber

6.5 kW1 stall

Torrance, California· 1.4 mi

J1772
$0.18 /kWhChargePoint
EV charger at Costco WholesaleCharging

Costco Wholesale

Power not listed11 stalls

Torrance, California· 1.5 mi

J1772
$0.20 /kWhEpic Charging

American Honda Motors - Guest Parking is <1 mi away.

Keep looking

This stop in context

Compatible vehicles

Cars that can charge here

Exact connector matches for J1772. An adapter may bridge another standard, but support varies by vehicle and station.

Time at this post

How long would your car sit here?

Level 2 · AC only

9 hr 37 min10% to 80%

Audi A6 e-tron takes about 6.48 kW on AC, so a full pack is a different kind of wait.

Estimate from 75.8 kWh at 6.48 kW, including the tail a pack spends balancing at the end.

Common questions

Charging at Charles H. Wilson Park (1)

Where is Charles H. Wilson Park (1)?

Charles H. Wilson Park (1) is at Parking lot, 2300-2376 Jefferson St, Torrance, CA 90501, USA.

How fast can I charge at Charles H. Wilson Park (1)?

Charles H. Wilson Park (1) lists a peak of 6.5 kW (Level 2) and J1772 connectors.

How much does charging cost at Charles H. Wilson Park (1)?

Charles H. Wilson Park (1) quotes $0.25 per kWh. Networks set their own tariffs, and some add a session or connection fee.

How many charging stalls does Charles H. Wilson Park (1) have?

Charles H. Wilson Park (1) lists 1 charging stalls. Live availability is not tracked.