Level 2ChargePoint

Cal Poly Structure 131

1 Grand Ave, San Luis Obispo, CA 93407, USA

6.5 kW charging across 7 charging stalls, operated by ChargePoint. $0.50 per kWh listed.

EV charging at Cal Poly Structure 131
6.5 kW7 charging stalls
ChargePoint

Charging location

San Luis Obispo, California

J1772

The record

The station at a glance

Cal Poly Structure 131 is listed as level 2 charging in San Luis Obispo, California, operated by ChargePoint. It records 7 charging stalls and J1772 connectors.

The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.

Peak power
6.5 kW
Stalls
7
Connectors
1
Listed price
$0.50

Connectors

Plug options

1 listed

Power is the station’s peak, not a per-connector rating.

Access and setting

What surrounds the charger

Access: Public4 Hr Max Guests/Visitors - anytime Employees – Weekdays: 12 pm - 12 am, Weekends: never Student Commuters – Weekdays: 12 pm - 12 am, Weekends: never Student Residents – Weekdays: 5 pm - 9 am, Weekends: all day

These details come from the station listing, not a live check.

Nearby

Other charging stops

Browse the directory
EV charger at La Cuesta InnLevel 2

La Cuesta Inn

19.2 kW2 stalls

San Luis Obispo, California· <1 mi

J1772
Price not listedChargePoint

Mustang Village Leasing Office is <1 mi away.

Keep looking

This stop in context

Compatible vehicles

Cars that can charge here

Exact connector matches for J1772. An adapter may bridge another standard, but support varies by vehicle and station.

Time at this post

How long would your car sit here?

Level 2 · AC only

9 hr 37 min10% to 80%

Audi A6 e-tron takes about 6.48 kW on AC, so a full pack is a different kind of wait.

Estimate from 75.8 kWh at 6.48 kW, including the tail a pack spends balancing at the end.

Common questions

Charging at Cal Poly Structure 131

Where is Cal Poly Structure 131?

Cal Poly Structure 131 is at 1 Grand Ave, San Luis Obispo, CA 93407, USA.

How fast can I charge at Cal Poly Structure 131?

Cal Poly Structure 131 lists a peak of 6.5 kW (Level 2) and J1772 connectors.

How much does charging cost at Cal Poly Structure 131?

Cal Poly Structure 131 quotes $0.50 per kWh. Networks set their own tariffs, and some add a session or connection fee.

How many charging stalls does Cal Poly Structure 131 have?

Cal Poly Structure 131 lists 7 charging stalls. Its listed hours are 4 Hr Max Guests/Visitors - anytime Employees – Weekdays: 12 pm - 12 am, Weekends: never Student Commuters – Weekdays: 12 pm - 12 am, Weekends: never Student Residents – Weekdays: 5 pm - 9 am, Weekends: all day. Live availability is not tracked.