Level 2AmpUp

Atlantic County Utilities Authority

6700 Delilah Rd, Egg Harbor Township, NJ 08234, USA

11.5 kW charging across 2 charging stalls, operated by AmpUp. A per-kWh price is not listed.

EV charging at Atlantic County Utilities Authority
11.5 kW2 charging stalls
AmpUp

Charging location

Egg Harbor Township, New Jersey

J1772

The record

The station at a glance

Atlantic County Utilities Authority is listed as level 2 charging in Egg Harbor Township, New Jersey, operated by AmpUp. It records 2 charging stalls and J1772 connectors.

The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.

Peak power
11.5 kW
Stalls
2
Connectors
1
Listed price
Not listed

Connectors

Plug options

1 listed

Power is the station’s peak, not a per-connector rating.

Access and setting

What surrounds the charger

Access: PublicWeekdays: 7:00 AM - 5:00 PM Sat: 7:00 AM - 12:00 PMFree parkingGovernment

These details come from the station listing, not a live check.

Nearby

Other charging stops

Browse the directory
EV charger at Sport HyundaiDC fast

Sport Hyundai

50 kW1 stall

Egg Harbor Township, New Jersey· 1.5 mi

CCS1CHAdeMO
$0.40 /kWhChargePoint
EV charger at Boardwalk HondaDC fast

Boardwalk Honda

62.5 kW2 stalls

Egg Harbor Township, New Jersey· 2.0 mi

CCS1CHAdeMO
$0.59 /kWhChargePoint
EV charger at Liberty InnCharging

Liberty Inn

Power not listed1 stall

Galloway, New Jersey· 2.1 mi

NACS
Price not listedIndependent
EV charger at US Gas & FoodDC fast

US Gas & Food

62.5 kW3 stalls

Galloway, New Jersey· 2.1 mi

CCS1CHAdeMO
$0.79 /kWhChargePoint

California Apartments is 1.4 mi away.

Keep looking

This stop in context

Compatible vehicles

Cars that can charge here

Exact connector matches for J1772. An adapter may bridge another standard, but support varies by vehicle and station.

Time at this post

How long would your car sit here?

Level 2 · AC only

5 hr 40 min10% to 80%

Audi A6 e-tron takes about 11 kW on AC, even at this 12 kW post, so a full pack is a different kind of wait.

Estimate from 75.8 kWh at 11 kW, including the tail a pack spends balancing at the end.

Common questions

Charging at Atlantic County Utilities Authority

Where is Atlantic County Utilities Authority?

Atlantic County Utilities Authority is at 6700 Delilah Rd, Egg Harbor Township, NJ 08234, USA.

How fast can I charge at Atlantic County Utilities Authority?

Atlantic County Utilities Authority lists a peak of 11.5 kW (Level 2) and J1772 connectors.

How much does charging cost at Atlantic County Utilities Authority?

A per-kWh price is not listed for Atlantic County Utilities Authority. Some networks bill per minute or per session instead.

How many charging stalls does Atlantic County Utilities Authority have?

Atlantic County Utilities Authority lists 2 charging stalls. Its listed hours are Weekdays: 7:00 AM - 5:00 PM Sat: 7:00 AM - 12:00 PM. Live availability is not tracked.