Level 2AmpUp24-hour access

15 S Main St Parking Lot

15 S Main St, Putnam, CT 06260, USA

13.3 kW charging across 2 charging stalls, operated by AmpUp. A per-kWh price is not listed.

EV charging at 15 S Main St Parking Lot
13.3 kW2 charging stalls
AmpUp

Charging location

Putnam, Connecticut

J1772

The record

The station at a glance

15 S Main St Parking Lot is listed as level 2 charging in Putnam, Connecticut, operated by AmpUp. It records 2 charging stalls and J1772 connectors.

The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.

Peak power
13.3 kW
Stalls
2
Connectors
1
Listed price
Not listed

Connectors

Plug options

1 listed

Power is the station’s peak, not a per-connector rating.

Access and setting

What surrounds the charger

Access: Public24-hour accessFree parkingParking Garage/Lot

These details come from the station listing, not a live check.

Nearby

Other charging stops

Browse the directory
EV charger at Municipal LotLevel 2

Municipal Lot

6.5 kW1 stall

Putnam, Connecticut· <1 mi

J1772
Price not listedChargePoint
Level 2

Putnam CT Town Hall

6.5 kW1 stall

Putnam, Connecticut· <1 mi

J1772
Price not listedChargePoint
Level 2

23 Ballou Building

9.6 kW2 stalls

Putnam, Connecticut· <1 mi

J1772
Price not listedAmpUp

Municipal Lot is <1 mi away.

Keep looking

This stop in context

Compatible vehicles

Cars that can charge here

Exact connector matches for J1772. An adapter may bridge another standard, but support varies by vehicle and station.

Time at this post

How long would your car sit here?

Level 2 · AC only

5 hr 40 min10% to 80%

Audi A6 e-tron takes about 11 kW on AC, even at this 13 kW post, so a full pack is a different kind of wait.

Estimate from 75.8 kWh at 11 kW, including the tail a pack spends balancing at the end.

Common questions

Charging at 15 S Main St Parking Lot

Where is 15 S Main St Parking Lot?

15 S Main St Parking Lot is at 15 S Main St, Putnam, CT 06260, USA.

How fast can I charge at 15 S Main St Parking Lot?

15 S Main St Parking Lot lists a peak of 13.3 kW (Level 2) and J1772 connectors.

How much does charging cost at 15 S Main St Parking Lot?

A per-kWh price is not listed for 15 S Main St Parking Lot. Some networks bill per minute or per session instead.

How many charging stalls does 15 S Main St Parking Lot have?

15 S Main St Parking Lot lists 2 charging stalls. It is listed as open around the clock. Live availability is not tracked.