DC fastSupercharger

The Platform (2)

3911 Landmark St, Culver City, CA 90232, USA

250 kW charging across 8 charging stalls, operated by Supercharger. A per-kWh price is not listed.

EV charging at The Platform (2)
250 kW8 charging stalls
Supercharger

Charging location

Culver City, California

NACS

The record

The station at a glance

The Platform (2) is listed as dc fast charging in Culver City, California, operated by Supercharger. It records 8 charging stalls and NACS connectors.

The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.

Peak power
250 kW
Stalls
8
Connectors
1
Listed price
Not listed

Connectors

Plug options

1 listed

Power is the station’s peak, not a per-connector rating.

Access and setting

What surrounds the charger

Access: PublicGates close at 12:30 am! Don't get locked in!Pay parkingParking Garage/Lot

These details come from the station listing, not a live check.

Nearby

Other charging stops

Browse the directory
EV charger at The Platform (1)Level 2

The Platform (1)

6.5 kW6 stalls

Culver City, California· <1 mi

J1772
Price not listedChargePoint
Level 2

3585 Hayden

6.5 kW1 stall

Culver City, California· <1 mi

J1772
$0.50 /kWhChargePoint
Level 2

Samitaur Constructs

6.5 kW1 stall

Culver City, California· <1 mi

J1772
$0.50 /kWhChargePoint
EV charger at 9866 Regent StLevel 2

9866 Regent St

7 kW1 stall

Los Angeles, California· <1 mi

J1772
Price not listedFLO

The Platform (1) is <1 mi away.

Keep looking

This stop in context

Compatible vehicles

Cars that can charge here

Exact connector matches for NACS. An adapter may bridge another standard, but support varies by vehicle and station.

Time at this post

How long would your car sit here?

250 kW peak here

26 min10% to 80%

The car asks for 250 kW here to begin with, then tapers to about 49 kW as the pack fills.

Batterypress play
draws up to 250 kW≈ 235 mi added
Tesla Cybertruck specs

A 20-minute stop adds 61% — about 204 miles of range. Filling right to 100% instead takes 51 min.

Estimate from Tesla Cybertruck's 25-minute 10–80% time, capped by this post, on the usual taper: full power to about 45%, then a slow last fifth. A cold pack, a shared post or an older battery takes longer.

Common questions

Charging at The Platform (2)

Where is The Platform (2)?

The Platform (2) is at 3911 Landmark St, Culver City, CA 90232, USA.

How fast can I charge at The Platform (2)?

The Platform (2) lists a peak of 250 kW (DC fast) and NACS connectors.

How much does charging cost at The Platform (2)?

A per-kWh price is not listed for The Platform (2). Some networks bill per minute or per session instead.

How many charging stalls does The Platform (2) have?

The Platform (2) lists 8 charging stalls. Its listed hours are Gates close at 12:30 am! Don't get locked in!. Live availability is not tracked.