DC fastChargePoint24-hour access

Onvo Fultonville

128 Riverside Dr, Fultonville, NY 12072, USA

350 kW+ charging across 2 charging stalls, operated by ChargePoint. $0.50 per kWh listed.

EV charging at Onvo Fultonville
350 kW+2 charging stalls
ChargePoint

Charging location

Fultonville, New York

CCS1

The record

The station at a glance

Onvo Fultonville is listed as dc fast charging in Fultonville, New York, operated by ChargePoint. It records 2 charging stalls and CCS1 connectors.

The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.

Peak power
350 kW+
Stalls
2
Connectors
1
Listed price
$0.50

Connectors

Plug options

1 listed

Power is the station’s peak, not a per-connector rating.

Access and setting

What surrounds the charger

Access: Public24-hour accessFree parkingRest Stop

These details come from the station listing, not a live check.

Nearby

Other charging stops

Browse the directory
EV charger at Hydro ProsLevel 2

Hydro Pros

9.6 kW1 stall

Johnstown, New York· 4.6 mi

J1772
$0.45 /kWhEV Connect

Fulton Montgomery Community College - Allen House is 4.0 mi away.

Keep looking

This stop in context

Compatible vehicles

Cars that can charge here

Exact connector matches for CCS1. An adapter may bridge another standard, but support varies by vehicle and station.

Time at this post

How long would your car sit here?

400 kW peak here

22 min10% to 80%

The car asks for 195 kW here to begin with, then tapers to about 34 kW as the pack fills.

Batterypress play
draws up to 195 kW≈ 277 mi added
Audi A6 e-tron specs

A 20-minute stop adds 67% — about 265 miles of range. Filling right to 100% instead takes 44 min.

Estimate from Audi A6 e-tron's 22-minute 10–80% time, capped by this post, on the usual taper: full power to about 45%, then a slow last fifth. A cold pack, a shared post or an older battery takes longer.

Common questions

Charging at Onvo Fultonville

Where is Onvo Fultonville?

Onvo Fultonville is at 128 Riverside Dr, Fultonville, NY 12072, USA.

How fast can I charge at Onvo Fultonville?

Onvo Fultonville lists a peak of 350 kW+ (DC fast) and CCS1 connectors.

How much does charging cost at Onvo Fultonville?

Onvo Fultonville quotes $0.50 per kWh. Networks set their own tariffs, and some add a session or connection fee.

How many charging stalls does Onvo Fultonville have?

Onvo Fultonville lists 2 charging stalls. It is listed as open around the clock. Live availability is not tracked.