DC fastBlink24-hour access

Gentilini Chevrolet

500 John S Penn Blvd, Woodbine, NJ 08270, USA

60 kW charging across 1 charging stalls, operated by Blink. $0.39 per kWh listed.

EV charging at Gentilini Chevrolet
60 kW1 charging stalls
Blink

Charging location

Woodbine, New Jersey

CCS1

The record

The station at a glance

Gentilini Chevrolet is listed as dc fast charging in Woodbine, New Jersey, operated by Blink. It records 1 charging stalls and CCS1 connectors.

The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.

Peak power
60 kW
Stalls
1
Connectors
1
Listed price
$0.39

Connectors

Plug options

1 listed

Power is the station’s peak, not a per-connector rating.

Access and setting

What surrounds the charger

Access: Public24-hour accessFree parkingDealership

These details come from the station listing, not a live check.

Nearby

Other charging stops

Browse the directory
DC fast

Gentilini Ford

120 kW6 stalls

Woodbine, New Jersey· <1 mi

CCS1J1772
$0.49 /kWhBlink
EV charger at Surf Side ParkLevel 2

Surf Side Park

6.5 kW1 stall

Avalon, New Jersey· 9.7 mi

J1772
$0.25 /kWhChargePoint
EV charger at Circle Liquor StoreDC fast

Circle Liquor Store

62.5 kW2 stalls

Somers Point, New Jersey· 12 mi

CCS1CHAdeMO
$0.45 /kWhChargePoint
EV charger at Ocean City City HallLevel 2

Ocean City City Hall

6.5 kW1 stall

Ocean City, New Jersey· 12 mi

J1772
Price not listedChargePoint
EV charger at Lexus of Atlantic CityDC fast

Lexus of Atlantic City

62.5 kW4 stalls

Egg Harbor Township, New Jersey· 16 mi

CCS1CHAdeMO+1
$0.35 /kWhChargePoint

Gentilini Ford is <1 mi away.

Keep looking

This stop in context

Compatible vehicles

Cars that can charge here

Exact connector matches for CCS1. An adapter may bridge another standard, but support varies by vehicle and station.

Time at this post

How long would your car sit here?

60 kW peak here

53 min10% to 80%

The car asks for 60 kW here to begin with, then tapers to about 34 kW as the pack fills.

Batterypress play
draws up to 60 kW≈ 277 mi added
Audi A6 e-tron specs

A 20-minute stop adds 27% — about 105 miles of range. Filling right to 100% instead takes 1 hr 15 min.

Estimate from Audi A6 e-tron's 22-minute 10–80% time, capped by this post, on the usual taper: full power to about 45%, then a slow last fifth. A cold pack, a shared post or an older battery takes longer.

Common questions

Charging at Gentilini Chevrolet

Where is Gentilini Chevrolet?

Gentilini Chevrolet is at 500 John S Penn Blvd, Woodbine, NJ 08270, USA.

How fast can I charge at Gentilini Chevrolet?

Gentilini Chevrolet lists a peak of 60 kW (DC fast) and CCS1 connectors.

How much does charging cost at Gentilini Chevrolet?

Gentilini Chevrolet quotes $0.39 per kWh. Networks set their own tariffs, and some add a session or connection fee.

How many charging stalls does Gentilini Chevrolet have?

Gentilini Chevrolet lists 1 charging stalls. It is listed as open around the clock. Live availability is not tracked.