Charging stationWevo Energy24-hour access

Garden City Partners

2481 Jericho Tpke, Garden City Park, NY 11040, USA

Power not listed charging across 2 charging stalls, operated by Wevo Energy. $0.50 per kWh listed.

Power not listed2 charging stalls
Wevo Energy

Charging location

Garden City Park, New York

J1772

The record

The station at a glance

Garden City Partners is listed as a charging stop in Garden City Park, New York, operated by Wevo Energy. It records 2 charging stalls and J1772 connectors.

The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.

Peak power
Power not listed
Stalls
2
Connectors
1
Listed price
$0.50

Connectors

Plug options

1 listed

Power is the station’s peak, not a per-connector rating.

Access and setting

What surrounds the charger

Access: Public24-hour access

These details come from the station listing, not a live check.

Nearby

Other charging stops

Browse the directory
Level 2

Millennium Toyota

6.5 kW1 stall

Hempstead, New York· 2.5 mi

J1772
$0.60 /kWhChargePoint
EV charger at LidlDC fast

Lidl

320 kW8 stalls

New York, New York· 2.9 mi

CCS1NACS
$0.32 /kWhMonta
EV charger at TargetDC fast

Target

320 kW8 stalls

Belmont, New York· 3.5 mi

CCS1NACS
Price not listedIndependent

Country Glen Center - Stop & Shop is 2.0 mi away.

Keep looking

This stop in context

Compatible vehicles

Cars that can charge here

Exact connector matches for J1772. An adapter may bridge another standard, but support varies by vehicle and station.

Time at this post

How long would your car sit here?

Level 2 · AC only

5 hr 40 min10% to 80%

Audi A6 e-tron takes about 11 kW on AC, so a full pack is a different kind of wait.

Estimate from 75.8 kWh at 11 kW, including the tail a pack spends balancing at the end.

Common questions

Charging at Garden City Partners

Where is Garden City Partners?

Garden City Partners is at 2481 Jericho Tpke, Garden City Park, NY 11040, USA.

How fast can I charge at Garden City Partners?

The record does not list a peak charging power for this station. It lists J1772 connectors.

How much does charging cost at Garden City Partners?

Garden City Partners quotes $0.50 per kWh. Networks set their own tariffs, and some add a session or connection fee.

How many charging stalls does Garden City Partners have?

Garden City Partners lists 2 charging stalls. It is listed as open around the clock. Live availability is not tracked.