DC fastChargeSmart EV24-hour access

Chevrolet of Puente Hills - Main Lot

17310 Gale Ave, City of Industry, CA 91748, USA

120 kW charging across 1 charging stalls, operated by ChargeSmart EV. $0.55 per kWh listed.

120 kW1 charging stalls
ChargeSmart EV

Charging location

Industry, California

CCS1

The record

The station at a glance

Chevrolet of Puente Hills - Main Lot is listed as dc fast charging in Industry, California, operated by ChargeSmart EV. It records 1 charging stalls and CCS1 connectors.

The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.

Peak power
120 kW
Stalls
1
Connectors
1
Listed price
$0.55

Connectors

Plug options

1 listed

Power is the station’s peak, not a per-connector rating.

Access and setting

What surrounds the charger

Access: Public24-hour accessFree parkingDealership

These details come from the station listing, not a live check.

Nearby

Other charging stops

Browse the directory
EV charger at Puente Hills SubaruDC fast

Puente Hills Subaru

62.5 kW1 stall

Industry, California· <1 mi

CCS1CHAdeMO
Price not listedChargePoint
Level 2Closed

Big League Dreams

6.5 kW1 stall

West Covina, California· 3.1 mi

J1772
$0.35 /kWhChargePoint

Puente Hills Subaru is <1 mi away.

Keep looking

This stop in context

Compatible vehicles

Cars that can charge here

Exact connector matches for CCS1. An adapter may bridge another standard, but support varies by vehicle and station.

Time at this post

How long would your car sit here?

120.65 kW peak here

29 min10% to 80%

The car asks for 121 kW here to begin with, then tapers to about 34 kW as the pack fills.

Batterypress play
draws up to 121 kW≈ 277 mi added
Audi A6 e-tron specs

A 20-minute stop adds 53% — about 210 miles of range. Filling right to 100% instead takes 51 min.

Estimate from Audi A6 e-tron's 22-minute 10–80% time, capped by this post, on the usual taper: full power to about 45%, then a slow last fifth. A cold pack, a shared post or an older battery takes longer.

Common questions

Charging at Chevrolet of Puente Hills - Main Lot

Where is Chevrolet of Puente Hills - Main Lot?

Chevrolet of Puente Hills - Main Lot is at 17310 Gale Ave, City of Industry, CA 91748, USA.

How fast can I charge at Chevrolet of Puente Hills - Main Lot?

Chevrolet of Puente Hills - Main Lot lists a peak of 120 kW (DC fast) and CCS1 connectors.

How much does charging cost at Chevrolet of Puente Hills - Main Lot?

Chevrolet of Puente Hills - Main Lot quotes $0.55 per kWh. Networks set their own tariffs, and some add a session or connection fee.

How many charging stalls does Chevrolet of Puente Hills - Main Lot have?

Chevrolet of Puente Hills - Main Lot lists 1 charging stalls. It is listed as open around the clock. Live availability is not tracked.