DC fastChevrolet of Puente Hills - Main Lot
17310 Gale Ave, City of Industry, CA 91748, USA
120 kW charging across 1 charging stalls, operated by ChargeSmart EV. $0.55 per kWh listed.
Charging location
Industry, California
The record
The station at a glance
Chevrolet of Puente Hills - Main Lot is listed as dc fast charging in Industry, California, operated by ChargeSmart EV. It records 1 charging stalls and CCS1 connectors.
The figures below come from the station listing. EVDIR does not track live availability, so check the network’s app before relying on a stall.
- Peak power
- 120 kW
- Stalls
- 1
- Connectors
- 1
- Listed price
- $0.55
Connectors
Plug options
Power is the station’s peak, not a per-connector rating.
Access and setting
What surrounds the charger
These details come from the station listing, not a live check.
Nearby
Other charging stops
Puente Hills Subaru is <1 mi away.
Keep looking
This stop in context
Compatible vehicles
Cars that can charge here
Exact connector matches for CCS1. An adapter may bridge another standard, but support varies by vehicle and station.

Acura ZDX
From $64,500 · 327 mi EPA · 190 kW DC

Audi A6 e-tron
395 mi EPA · 225 kW DC

Audi e-tron GT
249 mi EPA · 268 kW DC

Audi Q4 e-tron
288 mi EPA · 165 kW DC
Time at this post
How long would your car sit here?
120.65 kW peak here
The car asks for 121 kW here to begin with, then tapers to about 34 kW as the pack fills.
A 20-minute stop adds 53% — about 210 miles of range. Filling right to 100% instead takes 51 min.
Estimate from Audi A6 e-tron's 22-minute 10–80% time, capped by this post, on the usual taper: full power to about 45%, then a slow last fifth. A cold pack, a shared post or an older battery takes longer.
Common questions
Charging at Chevrolet of Puente Hills - Main Lot
Where is Chevrolet of Puente Hills - Main Lot?
Chevrolet of Puente Hills - Main Lot is at 17310 Gale Ave, City of Industry, CA 91748, USA.
How fast can I charge at Chevrolet of Puente Hills - Main Lot?
Chevrolet of Puente Hills - Main Lot lists a peak of 120 kW (DC fast) and CCS1 connectors.
How much does charging cost at Chevrolet of Puente Hills - Main Lot?
Chevrolet of Puente Hills - Main Lot quotes $0.55 per kWh. Networks set their own tariffs, and some add a session or connection fee.
How many charging stalls does Chevrolet of Puente Hills - Main Lot have?
Chevrolet of Puente Hills - Main Lot lists 1 charging stalls. It is listed as open around the clock. Live availability is not tracked.



